PROJECT:
Winter Road Peatlands
Phase 1 - Feasibility
Phase 1 was a cursory look at multiple sites which were selected for possible restoration. Phase 1 is complete. Review the report below.
Phase 2 - Project designs
Phase 2 design plans for 3, 1-mile segments are complete. These projects are proposed for winter 2026 construction.
Interactive Map
An online map link is available for viewing the proposed project locations. The map displays public, private, and tribal lands in addition to watershed boundaries and land uses.
This map is interactive. Comments on the locations can be made by using the “Smart Editor” tool in the map.